Value: £8,000,000
Duration: 52 weeks

The Project Background

Working on an existing partially developed location , H Sweet were contracted to provide infrastructure installations to facilitate the future development of the overall site to future proof our Client’s long term market requirements.

Our Approach

Taking a site wide and forward thinking approach to the construction and design of this project was key in ensuring that these works could be delivered with minimal disruption to existing operations with an eye on the changing requirements of the site based upon market demand. With ecological constraints being key, H Sweet worked through an evolving scheme to ensure that planning conditions were met without reducing the overall success of this project.

The Outcome

The installation of roadways and drainage infrastructure following site clearance was achieved in tandem with the ongoing development works on this prestigious site. Working closely with the Client and other stakeholders, H Sweet delivered this project by utilising a flexible and collaborative approach which contributed to the ongoing success of the site-wide scheme as a whole.

Related Content

News

Join Us

Careers and Vacancies

We have current vacancies for construction professionals and apprenticeships.

Read more

News

Join Us

Quantity Surveyor Vacancy

We have a permanent vacancy for a Quantity Surveyor, based in Nailsea near Bristol.

Read more

News

Join Us

Accounting Assistant Apprentice Vacancy

H Sweet and Sons are recruiting for an Accounting Assistant Apprentice

Read more